Our Aussie Made NODIG Moles, are tough tools made for tough Australian conditions and spcificall designed to for under road boring service installation.
You can install buried cables, conduits and small pipes without digging-up roads, driveways and footpaths!
Get rid of the reinstatement cost & keep the profit in-house!
All NO DIG Moles features the convenience quarter turn forward and reverse control. Operators can quickly change direction by simply rotating the air supply hose quarter of a turn.
Check out our No Dig Moles we have for sale.
| Specifications | ||||
| Diameter | Length | Weight | Air Consumption | Max. Pressure |
| 45 mm (1-3/4in) | 910 mm (36in) | 8 kg | 18 cfm | 760 kpa (110psi) |
| 54 mm (2-1/8in) | 1220 mm (48in) | 11 kg | 22 cfm | 760 kpa (110psi) |
| 65 mm (2.5in) | 1100 mm (43in) | 20 kg | 30 cfm | 760 kpa (110psi) |
| 76 mm (3in) | 1380 mm (54in) | 34 kg | 40 cfm | 760 kpa (110psi) |
The hammer head provides the No Dig Mole with rapid penetration and accurate direction for under road boring, even in the toughest soil conditions.
NO DIG Mole utilises a bare minimum of moving parts which ensures greater durability and reliability.
Fewer moving parts ensures the under road boring Mole last the distance and it makes it easier to service with local parts available..
Going Trenchless with our Aussie Made No Dig Mole for under road boring will eliminate the cost and the hassle of traffic management along with the complaints that go with it. Traffic management can be a very costly exercise, and can involve many resources, as nearly every road closure (in Australia) needs to follow Australian Standards and must pass local Shire regulations.
Re-instatement can be one of the most costly items on any trenching job. Therefore going trenchless realy makes sense.
Repair of road pavements, footpaths and concrete driveways are time consuming and costly. Things like pattern concrete and red asphalt driveways can be very difficult to match and sometimes requires removal of very large section in order to get the repair to blend.
Contractors avoid disturbing pavement, roads and landscaped surfaces which, greatly reduces the need to restore asphalt or concrete once the job is completed.
Realise fantastic savings by using the NO DIG Mole to install Telecommunication cables, Fiber Optic (for the NBN), Electric cables, Gas, Water & Retic pipes under roads, footpaths and driveways.